Rouget Road Solar Farm Project

Site Plan for the MPSC Application

Meeting Information

Rouget Road Solar Farm, LLC is planning to apply to the Michigan Public Service Commission (MPS) for approval to develop, construct, own, and operate a 175-MW alternating current (AC) solar photovoltaic (PV) generation facility located in Palmyra Township, Lenawee County, Michigan, approximately 4.5 miles northeast of Blissfield, Michigan, and 6.5 miles southeast of Adrian, Michigan. The Project will consist of solar panels and inverters arranged in PV arrays along with associated facilities and infrastructure. The associated facilities and infrastructure include the Project substation, switchyard, operations and maintenance (O&M) building, overhead transmission line to point-of-interconnection (POI), underground electrical cables (collection) to the Project substation, perimeter fencing, temporary and permanent stormwater basins, laydown yards for construction, and access roads to each PV array and the Project substation.

Rouget Road Solar Farm, LLC will hold a public meeting to consider public comment on its site plan for the Project:

Date: Monday, August 25, 2025
Time: 5:30 p.m.
Location:
American Legion Post #325
451 High Street, Blissfield, MI 49228

  • If you would prefer to send written comments for consideration, please forward them prior to the public meeting to J. Kevin Cole at JKevin.Cole@rwe.com.

  • Persons with disabilities needing accommodations for effective participation in the public meeting should contact J. Kevin Cole at JKevin.Cole@rwe.com at least seven (7) calendar days in advance of the meeting to request mobility, visual, hearing or other assistance.

Contact Information

J. Kevin Cole
JKevin.Cole@rwe.com

Project Resource

Rouget Road Solar Farm web page