Silver Maple Solar Project

Site Plan for the MPSC Application

Meeting Information

Silver Maple PV, LLC is planning to apply to the Michigan Public Service Commission (MPSC) for approval to develop, construct, own, and operate a 200-MW alternating current (AC) solar photovoltaic (PV) generation facility located in Zeeland and Jamestown Townships, Ottawa County, Michigan, approximately 4.3 miles east of Zeeland, Michigan, and 3.6 miles southwest of Hudsonville, Michigan. The Project will consist of solar panels and inverters arranged in PV arrays along with associated facilities and infrastructure. The associated facilities and infrastructure include the Project substation, switchyard, operations and maintenance (O&M) building, overhead transmission line to point-of-interconnection (POI), underground electrical cables (collection) to the Project substation, perimeter fencing, temporary and permanent stormwater basins, laydown yard for construction, and access roads to each PV array and the Project substation.  

Silver Maple PV, LLC is holding three public meetings to consider public comment on its site plan for the Project:

Date: March 17th
Time: 6:00 p.m. EST
Location: Evergreen Ministries, 4512 48th Ave, Hudsonville, MI 49426

Date: March 18th and March 19th
Time: 6:00 p.m. EST
Location: Zeeland Township Hall, 6582 Byron Road, Zeeland, MI 49464

  • If you would prefer to send written comments for consideration, please forward them prior to the public meeting to Joseph Brochu at silvermaplesolar@rwe.com.

  • Persons with disabilities needing accommodations for effective participation in the public meeting should contact Joseph Brochu at silvermaplesolar@rwe.com at least seven (7) calendar days in advance of the meeting to request mobility, visual, hearing or other assistance.

Contact Information

Joseph Brochu
silvermaplesolar@rwe.com

Project Resource

Silver Maple Solar web page